Twelve owners. One parcel.

Most land that looks buildable isn't. It sits split across a dozen khasra or survey numbers, a dozen owners and a dozen title histories. We assemble those holdings into a single contiguous parcel with clear title — so you negotiate one transaction, not twelve.

Where
Across India: Maharashtra, Gujarat, Madhya Pradesh and NCR
For
Real estate and renewable energy developers, and landowners
Cadastral drawing: nine separately owned khasra holdings enclosed by one consolidated boundary Nine irregular land holdings drawn with fine internal boundary lines, all contained within a single heavy outer boundary line representing the assembled, buildable parcel. 112/3 112/4 113 114/1 114/2 115 116/2 117 118 N
Every fine line is a separate owner. The heavy line is what we hand over.

Assembly, sourcing, custody.

We are not brokers passing on listings. We do the assembly, the diligence and the ongoing management ourselves, on the ground, in the revenue records.

Land aggregation

We identify adjoining holdings that together make a viable site, trace and approach each owner individually, then negotiate and acquire until the parcel is contiguous. Sequencing matters: it is planned so a single holdout cannot strand the assembly.

  • Khasra-level mapping
  • Owner tracing
  • Staged acquisition
  • Contiguity checks

Site sourcing

Give us the brief — location, approximate acreage, road frontage, intended land use, budget band — and we go and find what fits. You get a shortlist of checked options, not whatever is circulating in the market that week.

  • Brief to shortlist
  • Access and frontage survey
  • Land-use position
  • Comparables

Property and asset management

Once land is held, someone has to look after it. We handle upkeep, records, statutory dues and periodic reporting, so an asset held for a few years does not quietly turn into a problem you discover at sale.

  • Record keeping
  • Statutory dues
  • Site upkeep
  • Owner reporting

Across India, for real estate and renewable energy.

Our office is in Gurugram. Most of our current aggregation work is in Maharashtra, Gujarat and Madhya Pradesh.

Satellite view of Charanka Solar Park in Gujarat: dark blocks of solar panels with small farm fields around them.
Charanka Solar Park, Patan, Gujarat. Solar blocks, with small farm holdings pressed right up against them.
Satellite view of farmland near Baramati, Maharashtra: long, narrow strip fields side by side.
Farmland near Baramati, Pune district, Maharashtra. Long, narrow fields like these are what land looks like after generations of being divided between heirs.

Satellite images: Sentinel-2 cloudless 2016 by EOX IT Services GmbH (contains modified Copernicus Sentinel data 2016), CC BY 4.0. Shown for context; neither is a Bharat Link project.

Renewable energy

Solar and wind projects need large, contiguous sites with clear title, usually put together from many small farm holdings. It is the same work: map the holdings, check every title, acquire in sequence, and hand over one parcel.

  • Solar parks
  • Wind projects
  • Large contiguous sites

Real estate

Developers who need a site larger than any single owner holds, with every holding checked before the first payment rather than after the last one.

  • Residential
  • Commercial

Where we work

Maharashtra, Gujarat and Madhya Pradesh, where most aggregation is happening now, and Haryana and the NCR from our Gurugram office.

  • Maharashtra
  • Gujarat
  • Madhya Pradesh
  • Haryana and NCR

Every stage can stop the deal.

That is the point. A problem found at stage two costs a site visit. The same problem found at stage four costs the parcel.

The same nine holdings, shown at the current stage of assembly 112/3 112/4 113 114/1 114/2 115 116/2 117 118 N

Stage 4 of 4: one parcel, one title.

  1. Stage 1

    Identify and map

    Pull revenue records for the target area, map the holdings that would form a contiguous parcel, and confirm access and road frontage on site rather than on paper.

  2. Stage 2

    Title diligence

    Trace ownership on each holding, check mutation and succession history, and flag encumbrances, disputes or acquisition notices before any money moves.

  3. Stage 3

    Negotiate and acquire

    Approach each owner separately and agree terms, usually in stages. Holdouts are expected and planned for, not treated as a surprise.

  4. Stage 4

    Consolidate and hand over

    Complete registration, consolidate the records into a single parcel, and hand over a clean contiguous site with the full document trail behind it.

Own land?

A single small holding rarely sells to a developer or a solar project on its own. When your land sits beside others that together make a usable site, it becomes part of a larger assembly, which is the work we do.

  1. Send us the details

    Village, khasra or survey number, and area, on WhatsApp or by phone.

  2. We check the records

    The land records and mutation history, before there is any talk of price.

  3. We tell you where it stands

    Plainly: whether it fits a site we are assembling, and what would happen next.

  4. Sale and registration

    Every document explained to you before you sign anything.

Send your land details on WhatsApp

यह जानकारी हिंदी में चाहिए? हिंदी में पढ़ें

Bring us a requirement.

Looking for land, or sitting on it. Either way, start with a call — we will tell you quickly whether it is something we can work on.

Contact
Nikita Dalal
Office
1902, Tower‑3, BPTP Generations,
Sector 37D, Gurugram, Haryana
Open in Google Maps
Hours
Monday to Saturday, 9 am to 6 pm

Opens WhatsApp with your details filled in. Prefer email? Write to info@bharat-link.com.

Nothing you type here is stored on this website. It goes straight into a WhatsApp message to Nikita, and nothing is sent until you press send in WhatsApp.